fbpx

 

The topic is locked.
  • Re: 25 Hour Carb Inspections

    by » 9 years ago


    Another month and silence from Rotax on progress of the float issue. If only there was some way (like a blog or forum) where they could provide a little information on progress. :whistle:


    It has now been over two months since the inspection requirements have been out. Perhaps I have missed the updates from Rotax on the progress of fixing the float issue.

    While I understand it takes some time to get new parts manufactured, It should not take much time to update the users of their products on progress (or lack thereof) of correcting the problem. I understand that the carbs are outsourced to Bing, but certainly Rotax has been in contact with them to determine progress.

    Michael, I appreciate the information you obtained from Bing, perhaps the replacements are going to be out anytime. :)

  • Re: 25 Hour Carb Inspections

    by » 9 years ago


    Rotax doesn't have any control here this is all on Bing.
    I had heard third party that they weren't shipped for the first part Feb. like Bing had hoped and since that's long gone that person said next month. Until Bing gets a handle on shipment it's any ones best guess.

    Roger Lee
    LSRM-A & Rotax Instructor & Rotax IRC
    Tucson, AZ Ryan Airfield (KRYN)
    520-349-7056 Cell


  • Re: 25 Hour Carb Inspections

    by » 9 years ago


    I called Bing this morning and was told the floats should ship in another month (would be middle of March). Passing along the information.

You do not have permissions to reply to this topic.